Free-Topology Repeater: 2-Channel, 24 V - FR-20

$372.50

  • Two (2) Channel Segment Physical Layer Repeater
  • Connect FT (Free Topology) to FT LonWorks Network Segments
  • Extend a Network Segment Beyond Maximum Length
  • Increase Total Number of Nodes on a Network Channel
  • Power Status Indicator
  • DIN-rail Mounting

Model Number:


SKU: SCL1F-11
MODEL NUMBER: FR-20

Categories: ,

Description

The Smart Controls FR-20 is a two (2) channel physical layer repeater that cost-effectively extends the limits of a free topology LonWorks® network. The FR-20 provides electrical isolation between LON network channels to extend the maximum length of the channel and to increase the maximum number nodes on that channel. The FR-10 requires no software configuration and there are no jumpers to be set. DIN Rail mounting and screw plugs allow fast and easy installation in to existing or new LonWorks® networks. A nominal 24 Volt AC/DC power source is used to power the FR-20.

Specifications

General

Communications: Echelon® FTT-10A
Voltage Input: 12-28 VAC or 9-38 VDC
Power Consumption: maximum 2.0 VA
Operating Temperature: -20 to 70C (-4 to 158 F)
Humidity: 5 to 95% R.H. (non-condensing)
Physical Dimensions: L 35mm x W 113mm x H 58mm, (1.38” x 4.44” x 2.28”) with plugs connected
Weight: 57 grams (2 oz.)
Wire Type: AWG 22 to AWG 16 (copper conductors only)
Mounting: 35mm DIN-rail
EMI: CE Approved

Additional information

Weight 0.13 lbs
Manufacturer

Reviews

There are no reviews yet.

Be the first to review “Free-Topology Repeater: 2-Channel, 24 V”

Product Documents

No additional documents or details.

The Engenuity Difference

Headphones Icon

FREE TECH SUPPORT

No need to worry about using new products; we are here to help and support everything we sell.

Credit Card Icon

SHIPPING PERFORMANCE

You need shipping done your way. Fast. Accurate, tracked, and with flexibility.

Truck / Delivery Icon

KITTING LOGISTICS

Procurement and deployment can get complicated; let our 30 years of experience solve your most challenging logistics issues.

Shipping Icon

CREDIT ACCOUNTS

Cash flow and payment timing can shape a project. Talk to our credit team to help turn your project into a financial success.